Feasibility and Detailed Engineering Survey including Transmission Line Survey of Upper Dordi-A Hydropower Project (22MW)

Feasibility and Detailed Engineering Survey including Transmission Line Survey of Upper Dordi-A Hydropower Project (22MW)


Project Description

Feasibility and Detailed Engineering Survey including Transmission Line Survey of Upper Dordi-A Hydropower Project (22MW)

Completed on: May 2010

Project Details
  • Client:

    Welink Associates (P) Ltd

  • Location:

    Lamjung District